Road Line Factory R-75-1
900,000.00 $

Details

Thermal mixing paints factory works 380 volts of electricity and not less than 800 Amber load And has a feeder, and the unity of the mobilization, a winch industrial working on material transfer to the unit Confused and factory produces white and yellow paints in quantities of 75 tons to 500 tons pe

Request a quote


Product Code
R-75-1
Unit
unit

ملاحظات

1. The price does not include VAT.

2. The price does not include shipping charges.

3- Receipt from the factory land.

ID Title Content
1 Product weight Electronic weight unit for materials
2 Hand Tools Hand Tools
3 mix Mixing unit or two units with a capacity not less than 2 tons
4 Packing 25 kg bag welding unit
5 Material transfer Upper Transport Unit
6 Download and upload Installation of electric winch 5 tonne load
7 Supplies Metal fittings and fittings
8 Hand Tools Hand Tools
9 Technical equipment Technical equipment on site
10 laboratory Laboratory is equipped to test products
Customer Reviews

No Reviews

Related Products

Manufacture of R-20-1 production line

Cold mixing paints factory works 380 volts of electricity and not less than 800 Ampere load And has a feeder, and the unity of the mobilization, a winch industrial working on material transfer to the unit Confused and factory produces white and yellow paints in quantities of 25 tons to 200 tons pe

120000 $
Manufacturing R-25-2 production line

The thermal paint factory works 380 volts of electricity and not less than 800 amperes and has a feeder unit and a filling unit and a poonch that works on transporting the materials to the unit. The factory produces white and yellow paints in quantities of 25 tons to 250 tons

496000 $
Manufacture of R-50-1 production line

Thermal mixing paints factory works 380 volts of electricity and not less than 800 Amber load And has a feeder, and the unity of the mobilization, a winch industrial working on material transfer to the unit Confused and factory produces white and yellow paints in quantities of 50 tonnes to 250 tons

530000 $
Manufacture of R-50-2 production line

The thermal paint factory works 380 volts of electricity and not less than 800 amperes and has a feeder unit and a filling unit and a poonch that works on transporting the materials to the unit. The factory produces white and yellow paints in quantities of 50 tons to 250 tons

475000 $
Manufacturing R-50-3 production line

The thermal paint factory works 380 volts of electricity and not less than 800 amperes and has a feeder unit and a filling unit and a poonch which works on transporting the materials to the unit. The factory produces white and yellow paints in quantities of 50 tons to 300 tons

625000 $
Customer Services
Customer Services
Contact Us

Sent

Thank you for your message - we'll contact you shortly.